Subjects · Leaving Cert Computer Science
Leaving Cert Computer Science: Design process & SDLC
How often Design process & SDLC comes up on the Computer Science papers, every year it was asked, and questions to try.
HL Asked on 3 of the last 5 Higher Level papers, most recently in 2025. most years
OL Asked on 3 of the last 5 Ordinary Level papers, most recently in 2025. most years
Quick ones on Design process & SDLC.
- In short repeated cycles with user feedback
- Each stage is finished before the next starts
- All at the same time
- Requirements are fixed at the start
- No testing is needed
- Feedback can be acted on during development
- An early working model used to test ideas
- The user manual written for the product
- The final released product given to users
Show the answers
(a) Each stage is finished before the next starts
(b) Feedback can be acted on during development
(c) An early working model used to test ideas
Higher Level
Asked on 3 of the last 5 Higher Level papers, most recently in 2025. most years
Every paper, year by year
| Year | Where it came up |
|---|---|
| 2025 | B13 |
| 2024 | Not asked |
| 2023 | A12 |
| 2022 | B13 |
| 2021 | Not asked |
Links open the State Examinations Commission’s paper for that year.
More Design process & SDLC questions
Design process & SDLC, 3 marks
Which of these is a non-functional requirement for a booking app?
- Users can book a table for any date
- Users can cancel a booking online
- Pages must load in under 2 seconds
Show the answer
Pages must load in under 2 seconds
Functional requirements say what the system does; non-functional ones say how well it does it, such as speed, security or accessibility.
Ordinary Level
Asked on 3 of the last 5 Ordinary Level papers, most recently in 2025. most years
Every paper, year by year
| Year | Where it came up |
|---|---|
| 2025 | B15 |
| 2024 | Not asked |
| 2023 | B14 |
| 2022 | Not asked |
| 2021 | B13 |
Links open the State Examinations Commission’s paper for that year.
More Design process & SDLC questions
Design process & SDLC, 2 marks
A simple drawing of a screen layout, with no working features, is a…
- Prototype
- Flowchart
- Wireframe
Show the answer
Wireframe
A wireframe shows where buttons, text and images go. A prototype is a working early version that users can try out.
Design process & SDLC, 2 marks
A method that builds software in short cycles, getting feedback each time, is…
- Linear development
- Iterative development
- The waterfall model
Show the answer
Iterative development
Iterative (agile) development repeats design, build and test in short cycles. Waterfall finishes each stage fully before starting the next.
Design process & SDLC, 3 marks
In a staged (waterfall) process, which stage comes straight after design?
- Build the solution
- Investigate the problem
- Plan the project
Show the answer
Build the solution
The order is investigate, plan, design, build, test, evaluate. Building (coding) turns the design into a working product.
Other Computer Science topics
- Abstraction & pattern recognition
- Binary & hexadecimal
- CPU, memory & storage
- Embedded systems & sensors
- Ethics & social impact
- Flowcharts & pseudocode
- Internet, WWW & protocols
- Loops & trace tables
- Problem solving & puzzles
- Selection & Boolean logic
- Universal design & accessibility
- Variables, data types & operators
- Algorithmic complexity
- Data analytics & data quality
- Functions & modules
- Logic gates & truth tables
- Roles, teams & stakeholders
- Searching algorithms
- Testing & debugging
- AI & machine learning
- ASCII & Unicode
- History & emerging trends
- Lists
- Privacy & cybersecurity
- Basic electronics
- Databases
- Modelling & simulation
- Operating systems
- Quicksort
- Recursion
- Sorting algorithms
- Strings & string methods
- Heuristics
- Turing machines