How often Timber upper floors comes up on the Construction Studies papers, every year it was asked, and questions to try.
HL Asked on 2 of the last 9 Higher Level papers, most recently in 2024.
OL Asked on 4 of the last 9 Ordinary Level papers, most recently in 2023.
June 2028 is the first exam on the new Construction Studies course. These come from the 2016–2025 papers, so read them as a guide.
Quick ones on Timber upper floors.
- Supports the plasterboard ceiling boards
- Stiffens the joists and stops them twisting
- Adds sound insulation between the floors
- Notched and bolted to the stair string
- Single joists at wider centres
- Doubled trimmer and trimming joists
- 200–225 × 50 mm at 400 mm centres
- 300 × 100 mm at 900 mm centres
- 100 × 50 mm at 1200 mm centres
Show the answers
(a) Stiffens the joists and stops them twisting
(b) Doubled trimmer and trimming joists
(c) 200–225 × 50 mm at 400 mm centres
Higher Level
Asked on 2 of the last 9 Higher Level papers, most recently in 2024.
Every paper, year by year
| Year | Where it came up |
|---|---|
| 2025 | Not asked |
| 2024 | Q7 |
| 2023 | Not asked |
| 2022 | Not asked |
| 2021 | Not asked |
| 2019 | Not asked |
| 2018 | Q7 |
| 2017 | Not asked |
| 2016 | Not asked |
Links open the State Examinations Commission’s paper for that year.
More Timber upper floors questions
Timber upper floors, 3 marks
Why are floor joists set on edge rather than laid flat?
- Floorboards fit better on a narrow edge
- It saves headroom
- Depth gives far more strength and stiffness
Show the answer
Depth gives far more strength and stiffness
Stiffness rises with the cube of depth, so doubling the depth makes a joist about eight times stiffer. Laid flat, the same timber would sag badly.
Timber upper floors, 2 marks
Why are tongue-and-groove boards used for floor decks?
- They need no fixings
- The boards lock together and share loads
- They let the floor breathe through the joints
Show the answer
The boards lock together and share loads
Each tongue sits in the next board's groove, so boards cannot move against each other. This stops edges lipping, cuts squeaks and stiffens the floor.
Ordinary Level
Asked on 4 of the last 9 Ordinary Level papers, most recently in 2023.
Every paper, year by year
| Year | Where it came up |
|---|---|
| 2025 | Not asked |
| 2024 | Not asked |
| 2023 | Q1 |
| 2022 | Not asked |
| 2021 | Q8a |
| 2019 | Q5 |
| 2018 | Not asked |
| 2017 | Q7, Q8h |
| 2016 | Not asked |
Links open the State Examinations Commission’s paper for that year.
More Timber upper floors questions
Timber upper floors, 2 marks
What are joist hangers?
- Straps that stop the roof trusses lifting in the wind
- Timber pieces fixed between the studs
- Steel brackets that support joist ends at a wall
Show the answer
Steel brackets that support joist ends at a wall
Instead of building the joist end into the block wall, a steel hanger holds it. This keeps the joist dry and helps keep the wall airtight.
Timber upper floors, 3 marks
Why is herringbone strutting fitted between floor joists?
- To hold up the insulation between the joists
- To stiffen the joists and stop them twisting
- To carry electrical cables across the floor
Show the answer
To stiffen the joists and stop them twisting
Pairs of small timbers are fixed diagonally between joists. They make the joists act together, so the floor is stiffer and bounces less.
Timber upper floors, 3 marks
Why is a trimmer joist used at a stair opening?
- It carries the ends of the joists cut short
- It makes the floor soundproof above
- It supports the handrail at the top
Show the answer
It carries the ends of the joists cut short
Joists that would cross the stairwell are cut short. The trimmer, usually doubled, runs across to pick up their ends and passes the load to the trimming joists.
Other Construction Studies topics
- Health & safety
- House design & room layout
- Insulation & energy upgrades
- Low-energy & eco-friendly design
- Timber, joints, tools & finishes
- U-values & heat-loss costs
- Water supply & plumbing
- Foundations & concrete
- Passive House & EnerPHit
- Vernacular & heritage buildings
- Windows & glazing
- Renewable energy systems
- Airtightness & ventilation
- Drainage & wastewater treatment
- External walls
- Pitched roofs
- Plaster, paint & floor finishes
- Stairs & landings
- Doors & thresholds
- Orientation, solar gain & shading
- Stud partitions & internal walls
- Universal design & lifetime use
- Central heating systems
- Ground floors & radon
- Site selection & layout
- Thermal bridges & condensation
- Chimneys & flues
- Daylight & artificial lighting
- Electrical installation
- Flat roofs
- Planning permission & regulations
- House purchase & the industry
- Sound insulation & acoustics